Week of January 13

Great things are happening on the King City Library and Senior Centre construction site! Scroll down to see for yourself!

20200115_140200
The view of the children’s area, with wooden windows & glass panels installed.
20200115_140225
A view of the back of the library.
20200115_140411
A view of the lower floor entrance at the back of the Library.
20200115_140454
A view of the top floor, where adult fiction will be, and the lower level, where the adult non-fiction will be.
20200115_142354
The drywall is being installed on the lower level.
20200115_144149
The floor polishing is in the works on the kitchen floor of the Seniors Centre.
20200115_144659
The exterior wood panel installation on the main floor.

Week of January 8

Welcome to 2020! It has been too long since we’ve had a chance to update everyone on the construction project.

So please scroll down to see the newest changes of 2020, including exterior wood windows and glass panels and oh so shiny floors!

20200108_135209
The back of the building and the lower level entrance. With the installations of exterior wood windows and glass panels.
20200108_135223
The back of the building and the lower level entrance. With the installations of exterior wood windows and glass panels.
20200108_135328
The back of the building and the lower level entrance. With the installations of exterior wood windows and glass panels.
20200108_141726
Floor polishing is underway.
20200108_143618
The view from the Senior Centre side of the building looking East, with the installations of the exterior wood windows and glass panels.
20200108_143731
The parking lot lights have been installed.

Week of December 2

There might be holidays coming up, but that won’t stop the progress being made on the construction site. Scroll below to see for yourself!

Curtain wall
A view looking towards the public schoolyard from inside of the building on the top floor.
drywall-pic.jpg
One of the first interior walls of the main level is installed.
Stone Lamina pic
Samples of Stone Lamina for the façade in conjunction with the wood for the exterior of the building.
window-1-pic.jpg
You can see an installed wood window at the front of the building.
Window 2 pic
Windows to be installed on the lower level at the back of the building.

Week of November 25

Scroll down to see what’s new on the King City Library and Senior Centre construction site!

20191127_131011
The front of the building, the seniors’ centre side. With complete sidewalk/walkways, completed asphalt paving and light poles have been erected.
20191127_131353
The back of the Library, with the wood windows and air vapour barrier, has been installed.
20191127_131728
Drywall stud and ceiling framing being installed in the main hall behind the north wing in the basement area.

Week of November 11

There might not be big changes since our update last week, but we will take any progress we can get!

20191113_152602
The back of the library as viewed from the East.
20191113_152645
The back of the library.
20191113_152739
The drywall stud framing and exterior wall panel insulation in the basement area.
20191113_154318
The roof ladder is installed.

Week of November 4

All we can say is take a look for yourself!

20191106_135804
The view of the Seniors wing of the building, looking from the front.
20191106_140818
The view of the Children’s Wing and the East side of the building.
20191106_140945
The back of the Library, the entrance and back parking lot.
20191106_141038
The lower level, where the non fiction/study area will be, with drywall stud framing in progress.
IMG_0032
The upper level, where the adult fiction will be, with the drywall ceiling framing work in progress.

Week of October 28

Of course, you know by now that we are excited by any and all progress at the King City Library and Senior Centre construction site, but you can now start to imagine what the library will look like and where are different collections will be housed.

Scroll down to see for yourself!

20191030_125458

The back of the Library, the upper level will have Adult Fiction and the lower level will be Adult Non-Fiction.

20191030_125517
The back of the Library, the balcony will be accessed via the children’s wing on the upper level.
20191030_125542
The back of the Library.
20191030_125600
An architectural fence that has been installed on the East side of the property.

Week of October 21

Take a look at the most recent progress being made on the King City Library and Senior Centre. Scroll below to see photos!

20191023_114019
The front of the Library and Seniors Centre.
20191023_114110
The East side of the Library, which is the children’s wing.
20191023_114132
The back of the Library and a view of the back entrance.
20191023_114216
The back of the library, the adult wing.

Week of October 14

It now looks like it could maybe be a library! Scroll below to see the latest pictures of the King City Library and Senior Centre.

20191016_150738
The front of the library.
20191016_150846
The East Wing of the library.
20191016_151221
Floor polishing is in progress on the first floor in the community room.
20191016_151240
Drywall stud framing and electrical panel installation work on the lower floor.
20191016_151507
Front view of the senior centre’s side.

Week of October 7

With another week gone by comes another round of photographic evidence of progress being made to the King City Library and Senior Centre. With each week that passes, it seems that the changes become more obvious!

Scroll down to see the latest updates and don’t forget to check back here next week to stay up-to-date!

20191009_123338
The East Wing of the building with the outer glass panel installed, as viewed from the East.
20191009_123403
The North Wing of the building as viewed from the East.
20191009_123427
The East Wing of the building as viewed from the East.
20191009_123458
The North Wing of the building with the outer glass panel installed, as viewed from the North.
20191009_123957
The equipment has been installed in the mechanical room.
20191009_124103
The North Wing of the building as viewed from the West.
20191009_124140
The West Wing of the building with the outer glass panels installed, as viewed from the West.