Last week’s weather really tested our endurance to withstand cold temperatures and snowfall. But it has brightened our day to see that the weather did not slow down the progress on the construction site for the Library and Senior Centre.

Please scroll below to see the latest on the build!

20190130_133919
Rebar framing and formwork at Elevator Shaft
20190130_133941
Rebar and formwork of foundation walls at the west side of the building